  It there is a key how to test the room by oneself  The 15th National Congress employs and confirms the new home of future  
It there is a key how to test the room by oneself  The 15th National Congress employs and confirms the new home of future

The 1st method: See " putting on record "  Leave " two books " 


    Before the bridal chamber is moved in, the owner should see this copy of the document about putting on record of project , in order to confirm this project is the legal building ; Meanwhile, must keep developer offer " house quality guarantee the book " and " house operation instructions ".

The city produces Ann's chastity is moved in in October  Flower city of ten thousand years 


The second method: The bathroom does not store ¤K¤K without oozing


    Check whether the bathroom ground is the seepage , can put on the floor drain with the full sand in bags of plastics , then hold some water in the bathroom , 24 hours later , arrive to the corresponding lower floor bathroom, see whether there is seepage on its top . This had better go on with the upper strata household at the same time to measure , whether it is the seepage to measure the ground of the own bathroom, whether it is the seepage to measure the top of the own bathroom.


    Check whether to store water on the bathroom ground or not, hold some water in the bathroom first too, then turn on the water , see whether there is a ponding phenomenon on the ground . There is no water accumulation to exist on the qualified ground , because install the place of floor drain is the minimum place of the bathroom. However, except the blank room, because the floor drain reserves and paves the height containing ground on certain later stage around.


The third method: Flexible tight and bright ¤K¤K of doors and windows


    Whether it is flexible to have a try of the doors and windows and open, it is parallel to estimate among every side on the door and door frame , window and window frame, shut the doors and windows and listened to the sound insulation result, found out about their sealed degree too at the same time . However, the door of the bathroom does not demand to fit together perfectly , for being waterproof, must stipulate below overhead 1.5 centimetres instead.


    Paint quality of doors and windows is it is it fall to flow to watch mainly (whether paint drip mark that drop down), top that must brush the paint on each door, the door of the bathroom will brush that one under.


The 4th method: Rap every and listen to and split ¤K¤K emptily


    Wall plaster, ground decorate surface layer and other ornament surface layer there is empty phenomenon of splitting, so long as know once striking gently with the small hammer . On if it hear " winter winter ",but every piece with wall () piece exposed to not chinking, need doing over again; If hear clear and melodious hitting sound , indicate that they keep in touch well.


The 5th method: The household of top floor checks that oozes rain ¤K¤K


    If it was the top floor that bought, must look over whether there is mark of rainwater seepage in the top surface of each house . Because according to the construction request, or through " testing " of the heavy rain two times in the house handed over, or construct and then been drenched with rain the experiment under managing the supervision of the unit.


The 6th method: Balcony crack big dangerous ¤K¤K


    Generally speaking, cracks in the wall are not mostly structure cracks, result in aesthetic problems, but it is not big to be dangerous. The structure question of the house often appears in the balcony, in case find that there are cracks in the junctions of the room and balcony, it is probably the omen rupturing in the balcony, must notify the relevant unit immediately .


The 7th method: Keep warm no the good wall to drip ¤K¤K


    Winter, if the wall in the room forms the phenomenon of revealing (similar to the bottle beer iced in summer, put the water droplet presented in other bottle wall at the room temperature), the heat preservation on this wall is certainly problematic.


The 8th method: Turn on the tap and check greatly that leaks and stops up ¤K¤K


    Whether the water-supply line and sewer pipeline oozes, leaks, stops up the phenomenon, turn on the faucet and know , the ones that need paying attention to are , let the rivers be a bit heavier , a bit more urgent as much as possible , first see water pressure, second have a try of drainage speed.


The 9th method: The heating is propped up and in charge of having slope ¤K¤K


    Heating support, return water is it is it lay of level to in charge of to prop up, is it is it is it is it enter end that of water pipe is it higher than connect end those of the radiator to want to connect to in charge of to prop up to supply water, both ends are just opposite in height that the return water is propped up what has been managed, it is in direct radio to prop up the length of managing in this slope and two, generally difference 1 of each meter.


The 10th method: The heating pipeline wants sleeve pipe ¤K¤K


    Heat pipeline wear wall and wear floor should set up the sleeve pipe (hand over the place in the pipeline , wall or floor, put the pipeline in small and cut the tube ), the sleeve pipe in the ground should be higher than the ground by 2-3 centimetres, the ground should be higher than 5 centimetres of ground for what has been fitted up for the first time. Join splitting on the wall and floor after its function prevents heating the pipeline expands with heat and contract with cold.


The 11th method: Operating a switch can't lack ¤K¤K to cut out


    Electric brake and ammeter should check in the open air whether it can control the indoor lamps and lanterns and every socket in the room, whether totally cut out in the family after operating a switch in method ; There is the one that divides the floodgate in the family , should check respectively too whether each point of floodgate totally controls every branch circuit too.


The 12th method: The insurance socket is partial to the child ¤K¤K


    For prevent child from is it enter finger socket among the hole , must lead the safety from ground 30 high socket to stretch.


The 13th method: Many ¤K¤K of socket rule of bathroom


    The outlet inside of the bathroom should be the dampproof socket and defend the measure of spattering, the lighting lamp stand in the bathroom must be a safe lamp stand of magnetism mouth, there should not be socket above washing the hand basin.


The 14th method: Kitchen guarding neighbours on and ventilates a ¤K¤K


    The kitchen , bathroom should be arranged with ventilate one nearby, favorable to the fast discharge of gas , such as peculiar smell , waste gas ,etc. like this , keep the cleanness of the indoor air.


The 15th method: The interface of the switch draws ¤K¤K


    Check the firm degree of the switch , socket, does not especially forget to turn on the circuit interface of the telephone , TV set , draw hard, it is in name only to see.


All rights reserved © 2005-2007 Iraq plows happy Germany and buys property in Co., Ltd.
Company's address:The sixth floor of industrial and commercial bank of Asian-European way of port of Huorguosi
E_mail :info@xindezhiye.com  Tel.:0999—8792289 Fax:0999—8792289 Zipcode :835221
The network supports:luqiao network technolohy company undertakes to make and maintain the road